• Refunds & Return Policy
  • About Us
  • Outlet
  • Reviews
  • Terms & Conditions
  • Privacy Policy
Walter Whites Mafia.
Select category
  • Select category
  • Apparel
    • Night Clothes
    • Shorts
    • Socks
    • Workout Clothes
    • Yoga Pants
  • Body Sprays
    • Scents
  • Camping
    • Fishing
    • Fishing Gear
    • Outdoor Gear
    • Tents Chairs
  • Car Accessories
    • Floor Mats
    • Seat Covers
    • Steering Wheel Covers
  • Electronics
    • Earbuds
    • HeadPhones
    • Music Players
  • Food storage
    • Canning Supplies.
    • Freezer Dry Storage
  • Jewelry
    • Charm Bracelets
    • Earrings
    • Necklaces
    • Rings
  • Pen & Pencil Sets
  • Pet Supplies
    • Beds
    • Collars
    • Harnesses
    • Leashes
  • Small Kitchen Appliances
    • Knives
    • Mixers
    • Slicers, & Mandolins.
  • Tools
  • Toys
  • Wristwatches
  • Clothing
  • Watches
  • Hiking and Outdoor Recreation
  • Running
  • Men
  • Novelty
  • Socks and Hosiery
  • Pants
  • Sport Specific Clothing
  • Women
  • Work and Utility
  • Wrist Watches
Returns & Orders
Login / Register
Sign inCreate an Account

Lost your password?

0 items $0.00
Menu
Walter Whites Mafia.
0 items $0.00
  • Home
  • Shop By Categories
  • Products
  • About Us
  • New Arrivals
  • Contact Us
Click to enlarge
Home Pet Supplies Leashes lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog Blue
2 Dog Leash, 360° Swivel No Tangle Double Dog Walking & Training Leash, Comfortable Shock Absorbing Reflective Bungee Lead Walk 2 Dogs with Ease $11.99
Back to products
Joytale Tactical Dog Leash Heavy Duty,4-6FT Shock Absorbing Bungee Dog Leash with 2 Padded Handle,Metal Carabiner Clip,Car Seatbelt,Strong No Pull Dog Leash for Medium Large X-Large Dogs,Coyote Brown $15.99

lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog Blue

$18.49

  • SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability
  • NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
  • LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won’t get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
  • SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.
  • SIZE: 3/8″ (9.5 mm) in diam ,Size of this one is 30foot,color blue, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose
    {"prodid":6826,"asin":"B08HM4QFDR","prodcountry":"com","boxpos":false,"do_update":1}
    [{"domain":"com","name":"United States"}]
    {"main_aff_id":"walterwhite05-20","aff_ids":[{"country":"com","aff_id":"walterwhite05-20"}]}
  • -
Categories: Leashes, Pet Supplies
Share:
  • Description
  • Additional information
  • Reviews (0)
  • Shipping & Delivery
Description
Additional information
Item Weight

12.7 ounces

Manufacturer

Keenleader. , ltd.

Country of Origin

‎China

Item model number

LL-1

Date First Available

July 20 , 2019

Item Package Dimensions L x W x H

11.5 x 6.14 x 2.48 inches

Item Dimensions LxWxH

118.11 x 39.37 x 0.37 inches

Brand Name

Lynxking

Target Audience Keyword

dogs

Color

‎Blue

Size

rope3-8"x30'

Material

Polypropylene , Metal

Care Instructions

Hand Washable

Style

round rope lead

Breed Recommendation

Large Breeds

Brand

Visit the Lynxking Store

Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog Blue” Cancel reply

Your email address will not be published. Required fields are marked *

Shipping & Delivery

Related products

50 Pcs Fidget Toys Pack – Kids Stocking Stuffers Gifts for Kids, Party Favors Autism Autistic Children – Adults Stress Relief Sensory Toy – ADHD Toys Bulk for Classroom Treasure Box Prizes – Pop Its

$24.95
Buy Now

ALASOU 3PCS Suction Cup Spinner Toys for 1 Year Old Boy Girl|Spinning Top Baby Toys 6 12 18 Months|1 2 Year Old Boy Birthday Gift|Baby Bath Toys for Kids Ages 1-3|Sensory Toys for Toddlers 1-3

$9.99
Buy Now

CAT Construction Toys, Little Machines 5pk Truck Toy Set, Includes Dump Truck, Front Loader, Bulldozer, Backhoe, and Excavator Vehicles with Moving Parts, Cake Toppers Ages 3+

$5.99
Buy Now

Kids Toddler Talking Flash Cards with 224 Sight Words,Montessori Toys,Speech Therapy,Autism Sensory Toys,Learning Educational Gifts for Age 1 2 3 4 5 Years Old Boys and Girls

$12.99
Buy Now

LEGO Disney Princess Asha’s Cottage Building Set, 509 Pieces, for Ages 7 and Up

$23.80
Buy Now

Magnetic Tiles Toddler Toys Games Sensory Toys for Toddlers 3-4 Magnetic Blocks for Kids Age 3-5 4-8 Outdoor Toddler Activities Preschool Building Learning Toys

$19.99
Buy Now

MEGA BLOKS First Builders Toddler Blocks Toys Set, Big Building Bag with 80 Pieces and Storage, Blue, Ages 1+ Years

$16.00
Buy Now

PicassoTiles Magnetic Tiles 60pcs Kids Toys Classroom Sensory Toy for Toddlers STEM Learning Building Blocks, Montessori Pretend Play Magnet Tile Construction Stacking Block Boys Girls Ages 3+ PT60

$25.99
Buy Now

    Walter White Mafia is your one-stop destination for all your favorite products. Shop now for exclusive deals!

    Quick Links
    • Home
    • About Us
    • Shop
    • Categories
    Buy
    • Registration
    • Fashion Back Guarantee
    • Bidding & buying help
    • Stores
    • Start selling
    About Fashion
    • Company info
    • News
    • Investors
    • Careers
    • Government relations
    Stay connected
    • Facebook
    • Twitter
    • Instagram
    • Linkedin
    Copyright © 2024 Walter Whites Mafia. All Rights Reserved
    payments
    • Categories
    • Menu
    • Refunds & Return Policy
    • About Us
    • Outlet
    • Reviews
    • Terms & Conditions
    • Privacy Policy
    • Electronics
    • Body Sprays
    • Login / Register
    Shopping cart
    Close
    Shop
    0 items Cart
    My account